| @@ -84,6 +84,21 @@ experimental/optical_transport: | |||
| description: | | |||
| Comprehensive optical transport network schemas for DWDM/WDM systems (ADVA FSP 3000 and similar platforms). Covers four layers: wavelength (ITU-T G.694.1 grid, optical bands, DWDM channels), topology (logical optical nodes, passive multiplexers, fiber links), equipment (transponder/amplifier/ROADM modules, ROADM degrees, WSS cross-connects), and service (end-to-end optical services, optical paths, path segments). Not designed to be loaded together with extensions/optical_multiplexer. | |||
Contributor
There was a problem hiding this comment.
Looks like the description didn't get written?
Author
There was a problem hiding this comment.
Description for power_facility seems to be there I think, I only wrote power facility i think qos and Optical are just showing up because they were nearby in the metadata, could also have just been an accidental change due to spacing. Same for the below comment on R102
| experimental/location_extended (alternate Rack definition). | ||
| name: Power Facility | ||
|
|
||
| experimental/qos: |
Contributor
There was a problem hiding this comment.
I'm guessing this is also an artifact from what you copied it from?
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
I'd like to contribute a facility electrical/power schema to the experimental section for others to improve on and use. It models power flow from utility/generator through power panels (MSB/subpanel/RPP), breakers/circuits, and power drops into PDU/UPS devices. Depends on base and extensions/rack and lands drops on DcimDevice. Not a substitute for telecom extensions/circuit.