Configuration

Open Settings > Devices & services > PowerSync > Configure. Home Assistant shows connection and provider actions that apply to your setup. For a new installation, start with Installation.

Menu entry What to configure
Display currency Currency labels in connected clients
Electricity pricing & provider Provider, account, rates and plan
Change battery / control method Battery brand or control backend
Battery connection method & sensors Direct, companion-integration or monitoring route and source entities
Provider portal login GloBird portal and billing data
Amber Smart Shift connection and control owner Native Amber account, site and control permissions
Selected battery connection Device, API or companion settings in the battery directory
Smart Optimization Mode, goals, reserves, inputs, limits and dispatch
HA optimiser access Pair this server, refresh access or resume when requested
EV charging Vehicles, chargers and charging modes
EV load management Site and per-phase current limits
Advanced settings Specialist and optional features

The selected battery entry is Tesla API connection, Sigenergy connection, Sungrow Modbus connection, FoxESS connection, GoodWe connection, AlphaESS connection, ESY Sunhome connection, Solax connection, SAJ H2 connection, Fronius GEN24 storage connection, Neovolt connection, Anker Solix connection or Custom external controller. For SolarEdge, see the menu label limitation.

Advanced settings

Menu entry Reference
Network export limits / Flexible Exports Network envelope monitoring
AC inverter curtailment Separate AC inverter
Curtailment settings Solar curtailment permissions and thresholds
Additional solar accounting Include a separate array
Demand charge tracking Peak demand and billing
Weather & solar forecast Forecast sources
PowerSync auto-update Schedule HACS updates and restart
PowerSync Cloud energy-flow reporter Report readings to Cloud
Sungrow history relink Review and migrate Sungrow history

Use Back to PowerSync settings to return to the main menu.

Before changing settings

Most options save when you submit their section. Saving a connection normally reloads the integration. Many optimizer settings apply immediately. Structural changes or a failed live apply can trigger a reload.

Before switching battery brands or saving an installation with existing grid-charge blackout windows, review configuration limitations. After saving a control setting, verify device readback and measured power.

Amber Smart Shift connection and control owner

This entry appears for the Amber Smart Shift battery route. Use it to select the account and site, choose the control owner and set the permission to enable Smart Shift. Amber Smart Shift